Badak LNG provide troubleshooting & repair service of LNG and LPG facilities that include skilled and experienced workforce.
Badak LNG is experienced and is ready to provide services in conducting feasibility study including: conceptual design, commercial study, legal, etc.
- Develop maintenance management system
- Design organizational structures and manpower planning
- Develop HSEQ management systems for reliable and safe plant management;
- Run/operate train professionally;
- Develop supporting management systems such as marine operations, security management systems, spare part management, HR management systems, IT management systems, etc.
- Assist client and provide advisory to ensure smooth pre-commissioning & commissioning process of the LNG/LPG plant
- Assist client to conduct plant start-up safely
- Develop commissioning procedure as well as safe and reliable start-up and shutdown procedure.

Operator Training
18-months hands-on training program divided into 3 sessions:
Class Room Course (3 months),
On the Job Training (3 months), Job Specific Training at Plant Operation Area (12 months).
The program can be customized based on client’s need. Graduates will be ready to work as field operators in LNG Plant.
Maintenance Training
18-months hands-on training program divided into 3 sessions:
Class Room Course (3 months),
On the Job Training (3 months), Hands-On Maintenance Training (12 months).
The program can be customized based on client’s need.
Graduates will be ready to work as technicians/mechanics in LNG Plant.
Firefighting & Rescue Training
Badak LNG has great successes in personalizing competent firefighter through this training program.
Supported with experiences and comprehensive facilities, Badak LNG offers the opportunity for firefighter from other companies to improve their competencies through real LNG and hydrocarbon firefighting.
Laboratory Analysis Training
Badak LNG provides training program for Laboratory Analyst such as: ISO 17025, Gas Chromatograph, Atomic Absorption Spectrometry, High Performance Liquid Chromatography, and Sampling Method.
LNG Plant
Turn Around Training
Shutdown process is an important step in maintaining the reliability of plant operations. Therefore, shutdown implementation requires qualified personnel.
Badak LNG has extensive experience in the implementation of shutdown process with brilliant results. Badak LNG uses these experiences to develop qualified personnel.
LNG Plant Production Training
This training program aims to help companies that will carry out LNG production planning activities that involve coordination from upstream to buyer.
Marine Operation Training
This training program provides training in the operation of marine facilities which consist of on-shore facilities (ports, jetties, and loading dock) and offshore facilities (sea signs, tug boats, and mooring boats).
Badak LNG’s marine facilities have complied with ISPS (International Ship and Port Security) code and have been used to conduct training related to the compliance with ISPS port management system.
Tug Boat & Mooring Boat Docking Maintenance Training
Badak LNG has carried out docking activities for tug boats and mooring boats since 2013 at a dockyard built in the Badak LNG area.
The system developed by Badak LNG to perform this activity is valuable for companies which own tug boat and mooring boat facilities.
Research & Development
Lean Gas Study
-
Starting on May 2017, Badak LNG has received new lean gas supply which comes along with a lot of plant operational challenges. Badak LNG successfully processed this lean feed gas supply with the safe, reliable, and efficient plant operation by implementing any kind of plant adjustment, and plant optimization. Badak LNG is ready for sharing this challenging experience to the world
Dual HHV Study
-
The new Lean gas supply to Badak LNG Plant raises an issue of LNG HHV reduction which potentially may not be able to meet the existing contract specification. Badak LNG successfully managed this condition by transforming the plant operation from single LNG HHV production to Dual HHV production with two LNG product quality which is the first in the world.
Mini LNG Plant
-
Badak LNG do some research to develop Mini LNG Pilot Plant as the strategic project to catch the future business opportunity for processing natural gas in the small gas field spread throughout Indonesia area.
Hybrid Power Plant
-
Supporting the Indonesia government program in renewable energy, Badak LNG has initiated the small scale hybrid renewable energy project. The small scale hybrid renewable energy is the combination of Wind Power and Solar Panel with total capacity is 2,000 W.
Register Here
Professional Certification Agency

To strengthen the competence and capability of its workers, Badak LNG has formed Lembaga Sertifikasi Profesi (LSP, Professional Certification Agency) licensed by Badan Nasional Sertifikasi Profesi (BNSP, National Body of Profession Standardization). LSP Badak LNG currently has 86 certification schemes and is supported by assessors collaborated with the Offshore Petroleum Industry Training Organization (OPITO)
LSP Badak LNG conduct assessments for employees, partners, trainees and third parties. Certificates issued by LSP Badak LNG not only apply at the national level but also at the ASEAN and international levels.

1. Professional and experienced personnel in LNG industry
2. Real equipment, full scale LNG plant and workshop that provide real experience in operating and maintaining LNG plant
Contact Us
Jakarta Office
Jl MH Thamrin No 59,
Jakarta 10350,
Indonesia
Phone : +6221 31930243, 31936317
Fax : +6221 3142974
Bontang Plant Site
East Kalimantan,Indonesia
Phone : +62548 551300, 21133 (4 lines)
Balikpapan Representative
East Kalimantan, Indonesia
Phone. : +62542 764671
© 2020 PT Badak NGL. All Rights Reserved |
---|